Preparation of Detailed Project Report (DPR) of 52 MWp Floating Solar Plant at Umrangso Reservoir of Kopili Hydroelectric Power Station of North Eastern Electric Power Corporation (CPSU) at Assam. |
![]() |
The following major aspects have been covered in DPR: 1. In-depth study of solar power technologies including renewable and floating solar power scenarios in the North-East Region, India and globally 2. Analysis of Bathymetry, Hydrodynamics, Geotechnicals, Water Quality, Seismics and Flooding 3. Solar Irradiation and Environmental assessment 4. Analysis of results of SERIS testbed (Solar Energy Research Institute of Singapore) 5. Design of Floater, Anchoring, Mooring and Module Cleaning system. 6. Design of Grounding, Evacuation and Total Plant Layout 7. Simulation using PV system 8. SWOT Analysis of 40 MWp Floating Solar Project. 9. Environmental and Social Impact Assessment. 10. Seasonality assessment by P50, P75, P90 forecast. 11. Financial model and viability assessment of the project in terms of IRR, NPV, Cash Flow Statement, DSCR, Revenue, P&L Statement, Loan Schedule 12. Estimation of LCOE |
Other information
- Category Sustainable Energy
- Location Assam
- Project Finished Date 2023-08-31
- Project Duration 5 Months